Sharperto Posted April 12, 2013 Report Posted April 12, 2013 (edited) Well she's almost done, first run around tomorrow. I'm going to start from the end result and over the next few days upload pics of how I got to this stage. Engine 3sge beams Cp pistons HKS head gasket 3sgte rods Custom exhaust manifold ( in house ) Gt series garret turbo SR 20 throttle body Modified intake manifold Custom alloy intercooler piping ( in house ) Alloy radiator Very complex intake pipe ( in house ) Autronic SM4 Drive line T5 V8 gearbox Tilton clutch Custom flywheel ( in house ) Custom adaptor plate ( in house ) Modified Holden throw out release bearing ( in house ) Custom tail shaft Mazda diff 28 spline axles Mazda LSD Brakes + suspension Mazda 4 piston front calipers DBA 280 x 28 rotor 2 inch brake ducting Custom swaybar 24 mm Mazda single piston rear calipers 19 mm rear swaybar Adjustable pan hard rod ( in house ) Koni shocks ( soon to be change to double adjustabe coilovers ) Custom strut tops ( in house ) Body 80% body wrap designed by YBI creative Metal formed flares Velo seat Performance GTR wheels Race Technology dash and data logger Custom fuel lines Everything on this car is built in house at Cooper Auto Electrics except engine internals and assembly That was built and dynoed at Allan Engineering mallala Soooooooo much not listed and with more to come Love to know what you guys think Edited April 12, 2013 by ke70dave Quote
BUZ440 Posted April 12, 2013 Report Posted April 12, 2013 3SGE + T I'm a fan, glad to see some in house work being done also solid power curve me reckons, noice Quote
ke70dave Posted April 12, 2013 Report Posted April 12, 2013 I just merged the threads together and threw the photos in your first post. Awesome car!!! must go like a rocket. Quote
Sharperto Posted April 12, 2013 Author Report Posted April 12, 2013 Opps hit button twice sorry guys Quote
Sharperto Posted April 12, 2013 Author Report Posted April 12, 2013 Yeah thanks guys, went really well with 3sgte, should be better with beams. More power and the ability to move the power curve around, should be fun. Quote
corollaart Posted April 12, 2013 Report Posted April 12, 2013 Nice work!! I bet that a lot of hours have been put in to get that far. Should go like a cut cat. rob :2thumbs: Quote
drift freak Posted April 12, 2013 Report Posted April 12, 2013 Very nice mate, looks sweet and will go like a rocket :) Quote
oh what a nissan feeling! Posted April 12, 2013 Report Posted April 12, 2013 That looks insane, and great to see a turbo beams not really something ive seen much of. You did forget to add (in house) behind a few items though which I'm very disappointed with. Quote
Sharperto Posted April 14, 2013 Author Report Posted April 14, 2013 Well what weekend, first time out with the new setup and engine felt great. With very old tyres still managed my best time and was 15 kph up on top speed. Had a play with the new dash tonight and all looks good on the logger. Bring on may 18 and the new a050 tyres....can't wait. Quote
Sharperto Posted April 15, 2013 Author Report Posted April 15, 2013 As promised from the beginning. She was due some new paint Prepped and ready for paint Add paint New dash arrived More to come Quote
Sharperto Posted April 15, 2013 Author Report Posted April 15, 2013 Started to build exhaust manifold using old 3sgte to mock up Time to rebuild t5 Moved the starter to driver side More to come.. Quote
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.