Jump to content

Recommended Posts

Posted

I got this KE55 from my brother, he has had it in his farm shed for 8 years west of Gympie in Qld. A mate of ours overheated it driving out ther 8 years ago and left it there. My bro rebuilt the 4K with new pistons and the usual stuff. It's been run but not driven. So he started the body work and lost interest and it sat half rubbed back since. I finally bullied him into relinquishing it to me to make into a hillclimber and new home for an SXE10 Beams 3sge and 6MT that I had.

 

As "purchased".

 

KE55Beams007.jpg

 

KE55Beams006.jpg

 

The new engine with a 1UZ throttle body adapted to remove the stupid half drive by wire setup.

 

KE55Beams005.jpg

 

KE55Beams004.jpg

 

KE55Beams003.jpg

 

We decided to get the panel work done first and register as std and then do the conversion work.

The panel work was left to a pro as I hate it and am flat out with mechanical stuff 6 days a week anyway.

 

KE55Beams009.jpg

 

KE55Beams008.jpg

 

Came home after a weekend away and the 55 had been re-kermited.

 

KE55Beams015.jpg

 

KE55Beams016.jpg

 

Rego is next, then Beams, 6MT, hilux diff, coilover front, adaptronic etc.

Members dont see this ad
Posted

Haha, yeah no, it took him about 3 weeks to sort the body out and 2 days to paint.

I've got no car atm(other than the work ute) so have to get stuck into this thing so I have something cool to drive.

 

What's the consensus on xE7x rack coversions on these things?

  • 2 months later...
Posted

Did some work on this today. Pulled the old donk and box and associated crap no longer required.

Upon removing the brake booster we discovered that a subaru booster bolts straight in place of it, unfortunately the master cylinder pipe outlet wasn't quite right so we went through the piles of bits and found a pulsar GTiR booster and master. The booster was identical to the subaru unit but the master was more suitable so it got the nod. We also had the clutch master from the GTiR and the rolla needed one so we used it as well. The pedal box was customised to suit and it all bolted up nicely.

 

KE55Beams019.jpg

 

KE55Beams020.jpg

 

Next we swung the engine and box in. It didn't fit so we removed the swaybar and sectioned the rear of the sump to clear the drag link. Fitted better now but still had to give the floor some relief to get the box in place.

 

KE55Beams022.jpg

 

Inlet and exhaust manifolds fit too.

 

KE55Beams021.jpg

 

Engine and box mounts will be made tomorrow.

Posted

Got some more done today.

 

Mounted the gearbox and engine.

 

KE55Beams024.jpg

 

KE55Beams026.jpg

 

Used shackle bushes to make these.

 

Also fitted the front struts with coilovers and hilux 4 spots. We adapted some JIC subaru strut tops and springs to it for the moment. Also fitted the sigma lower arms.

Need to find wheels to suit the hilux diff and these struts. Less offset and a bit less width than these.

 

KE55Beams025.jpg

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

Loading...
×
×
  • Create New...